Trussed Up

Keith has brought the trusses on his truck. Big trusses; over 8m, so it is a big truck. I was worried about it cracking the concrete floor. The concrete is over 20 years old, and the thickness was quite minimal … Continue reading

Posted in Shed | Leave a comment

Ready for Trusses

All the beams are up. The rafters and battens have been put up on the western skillion to provide some bracing prior to the trusses going up. I thought we were all set for the trusses. I had expected the … Continue reading

Posted in Shed | Leave a comment

Beam Holiday

I took a day off work on rec leave to get into the construction. I had hoped that I would get 2 of the 6 beams up in the day, but in the end, only 1 was bolted in place. … Continue reading

Posted in Shed | Leave a comment

Shed Build Commenced

For now, the demolishing has finished, and construction commenced. The remaining structure has helped with supporting the steel columns, or which 6 of the 8 main columns are now stood. Around the outside, another 8 smaller columns will support a … Continue reading

Posted in Shed | Leave a comment

Site Flattened

Well… flattened as much as possible for now. I have left up a bit of frame over the old bath/laundry/toilet area. I think this will make it easier to get the new frame up. We’ve been cleaning the floor and … Continue reading

Posted in Shed | Leave a comment