Monthly Archives: June 2012

Starboard hull takes shape

The frames were already prepared, so it didn’t take long after the building stock was ready for some fast progress. Having the frames cut on the CNC router really made a big difference. The notches for the stringers and chines … Continue reading

Posted in Hull Frames | Leave a comment

Building Stock Ready

Using the existing concrete slab that was the floor of my old house, I have secured 4mm angle brackets with dynabolts. To each 9 pairs of brackets, I have screwed a 650mm piece of 100×50 cypress pine. Onto each edge … Continue reading

Posted in Preparations | Leave a comment