October Update – Cockpit

The cockpit is almost ready to glass out with cloth and epoxy resin.

The helm seat support bos is complete, with a compartment for the generator which vents out into the engine box, and storage space. The compartments were painted before the box was fitted.

The large motor on the port hull has a removable and hinged lid which includes seating space, and easy access to observe the motor when under way. Due to the power tilt/trim mechanism, this motor had to be mointed 5 inches heigher on the hull, hence the large box cowling over the top. You will see in one photo the metal section that will extend the motor leg from 25 to 30 inches.

A large lazarette locker is completed in the port hull, with the intention of holding our foldup bicycles.,

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *