Monthly Archives: April 2013

Forebeam Wiring

I have roughed in a power cable onto the forward edge of the forebeam. The intention for this is to have “headlights” on the forebeam striker, with the on/off switch at the helm. As shown in the photos, the cable … Continue reading

Posted in Electrical | Leave a comment

Bridgedeck Web

The bridgedeck joins the two hulls. The web is the curved front of the bridgedeck, forward of the beds in the two cabins. The web is used as a self draining locker for anchor chain and other large awkward items. … Continue reading

Posted in Joining the Hulls, Lockers, Sheeting the Hull | Leave a comment

Navigation Station Fitout Commenced

The fitout of the cabins is a structural component of the completed hull. Shelves are glued and coved onto the hull stringers, adding considerable stiffness to the outside skin of the boat. We are going to varnish the benchtop and … Continue reading

Posted in Cabins | Leave a comment