Monthly Archives: February 2013

Hulls Rolled – More Photos

I found more photos of the hull rollover. It was the hottest day of the summer, going well over 40 degrees. Here is a gallery of the snaps that were taken on the day.

Posted in Joining the Hulls | Leave a comment

Bridgedeck

The bridgedeck is the floor of the cabin that joins the 2 hulls. It is created from 6 sheets of 12mm plywood, which was step scarfed on the CNC router before joining, with 7 stringers of 60×40 douglas fir. The … Continue reading

Posted in Joining the Hulls | 1 Comment